Prep & masking

Powder Coating Masking and Prep in Colorado Springs

A coating is only as good as the surface under it. We clean, mask and plug your parts in-house, and pre-bake the ones that need it, to the drawing, before any powder or paint goes on.

Why prep decides how long the finish lasts

When a coating fails early, the cause is often the prep. Oil, cutting fluid, shop dirt, weld smoke and oxide all sit between the metal and the coating, and the film bonds to them instead of to the part. The result shows up later as poor adhesion, fisheyes, blisters or early rust.

Our powder supplier says it directly. Cardinal’s technical data sheets describe substrate pretreatment as “a critical factor in developing maximum corrosion resistance and maximizing the lifetime of the product.” The salt spray and adhesion numbers on a powder data sheet come from carefully prepared lab panels, so your parts only get close to them if the prep is right.

That is why prep is part of every job we run, not an add-on, whether the part is headed for production powder coating or industrial liquid paint.

What we do in-house

Solvent wipe and degrease

We remove oils, coolants, layout ink and fingerprints with a solvent wipe or degrease before parts go into the wash. This step matters most on machined parts and fresh laser-cut or formed sheet metal that still carries lubricant.

Multi-stage wash

Parts run through a multi-stage wash, then dry completely before coating. If your drawing or spec calls out a specific pretreatment chemistry or conversion coating, put it on the PO. We will confirm at quote time whether and how we meet it.

Outgas pre-bake

Porous and coated substrates can hold air, moisture and oil that come out in the oven and leave pinholes or blisters in the cured film. The usual suspects are:

  • cast aluminum and cast iron
  • hot-dip galvanized steel
  • hot-rolled steel with heavy mill scale
  • heavy weldments

For these parts we pre-bake at or above the powder’s cure temperature so the gas comes out before the powder goes on, then coat once the part has cooled. Powder makers such as PPG recommend a pre-bake for castings, galvanized and hot-rolled steel, and the American Galvanizers Association recommends one for hot-dip galvanized parts. Heavy weldments can trap gas in seams and weld porosity too, so flag them on your RFQ. Heavier parts need longer, so tell us the substrate and wall thickness when you request a quote. Our guide to powder coating galvanized steel and castings covers the details, including what to ask your galvanizer.

Masking and plugging

Masking keeps coating off the surfaces that have to stay bare. Common callouts include:

  • Threads and tapped holes: plugged so fasteners thread in without chasing.
  • Bores, bearing seats and press fits: a typical powder film adds a few thousandths per side, which is enough to ruin a close fit.
  • Mating and sealing faces: kept bare so gaskets seat and parts stack flat.
  • Ground and bonding points: left as bare metal where the assembly needs electrical continuity through the frame.
  • Datum surfaces and inspection features: kept clean so your receiving inspection measures metal, not coating.

We use high-temperature tapes, caps and plugs rated for the cure temperature, typically around 400°F at the part for our standard powders. On repeat part numbers, putting masking on the drawing is what lets us mask every batch to the same callout as the first.

Sanding and scuffing for recoat

When a part needs a second coat, a touch-up or rework, we scuff or sand the cured surface so the next coat has something to grip. Light sanding also smooths minor surface marks that would otherwise telegraph through a gloss finish.

Abrasive blasting, as part of your coating job

Some parts need a blasted surface before they can hold a coating: rusted or scaled steel, stainless steel that is too smooth for a good bond, or any job whose spec calls for a blast standard such as SSPC-SP 10 (near-white metal) or SP 6 (commercial blast).

For those jobs we work with a trusted blasting partner. We send the parts out, they come back blasted, and we pretreat and coat them, all inside your coating order. You get one quote, one PO and one point of contact. Blasting is something we coordinate as part of a coating job, so we don’t take blast-only work.

Plan on blasted parts taking a little longer than our standard lead time of about a week, since they make an extra trip.

How to get prep and masking right on your RFQ

The clearest RFQs make the prep decisions up front:

  1. Name the substrate. Steel, aluminum, stainless, galvanized or cast changes the prep plan.
  2. Mark every bare surface on the drawing. A note on the PO beats a phone call that never makes it onto the traveler.
  3. Call out the spec, including any blast standard, pretreatment or film thickness range.
  4. Flag ground points if the assembly needs electrical continuity.
  5. Tell us about hidden contamination, such as heavy oil, anti-spatter spray or a previous coating that has to come off.

Our coating callout checklist has wording you can copy onto a drawing, and the powder coating masking guide explains the trade-offs between tape, plugs and caps.

Prep and cost

Prep and masking are among the biggest variables in a piece price, and the ones you control most directly from the drawing. A bare bracket can be racked and coated quickly. A housing with twenty tapped holes, two bearing bores and a masked mounting face takes real hand time on every part. Our daily output runs from about 500 to 2,000+ parts depending on part size and masking: small unmasked brackets at the high end, large or masking-heavy parts lower.

If a masking callout is there out of habit rather than function, removing it is one of the easiest ways to lower cost. We are glad to look at a drawing and point out where that might apply. Send your drawings for a quote and we will price the prep, masking and coating together.

Common questions

Do you mask threads, or chase them after coating?

We mask or plug threads that the drawing calls out as uncoated, so they come back clean and ready to assemble. If your drawing allows threads to be chased after coating instead of masked, note it on the drawing and we will quote the masking accordingly.

How should I call out masking on my drawing?

Mark every surface, hole and thread that must stay bare, and add a note such as "mask all tapped holes and datum face A." Include ground or bonding points if the part needs electrical continuity. Putting masking on the drawing or PO is what lets us quote it accurately and mask every run to the same callout.

Can you sandblast my parts?

Yes, as part of a coating job. Put the blast standard you need, such as SSPC-SP 6 or SP 10, on the drawing or PO so it is priced with the coating, and allow a little extra lead time for the trip to our blasting partner.

Why do my cast or galvanized parts come back with pinholes?

Castings and hot-dip galvanized steel trap air and moisture that escape during cure and push bubbles through the film. An outgas pre-bake before coating usually reduces it a lot. On difficult castings an anti-gassing primer or tighter film build may also be needed. Let us know the substrate when you quote so we can plan for it.

Does masking add to the price?

Usually, yes. Masking is hand labor, and a part with many plugged holes takes longer per rack than a bare bracket. Calling out only the surfaces that truly need to stay bare is the simplest way to keep the piece price down.

Production finishing

Have a run of parts that needs a durable finish?

Send drawings, quantities and the finish spec. We quote powder coating, mil-spec painting and the prep, masking and printing around them on one PO.

Request a Quote